Tax ID: 0106577573
M&E & PCCC Thai Binh Completion & Handover

Jinro Soju Wine Factory in Vietnam

The first Soju wine factory project abroad of HiteJinro Group (Korea) is located in Lien Ha Thai Industrial Park, Thai Binh with a construction floor area of 27,250 m², requiring particularly strict M&E and fire safety technical standards for the alcoholic beverage production line.

Jinro Soju Wine Factory in Vietnam
Specific Technical Requirements

Project Problems

The alcoholic beverage factory (Ethanol/Soju) has an alcohol tank area, mixing and filling area that is at high risk of fire and explosion, requiring explosion-proof electrical equipment and a specialized fire protection system that simultaneously meets Vietnamese standards and the technical standards of the Korean HiteJinro Group.

Organization of Construction & Acceptance

APECCons Solutions

APECCons has organized a team of specialized engineers to coordinate closely with the Korean Project Management Board, synchronously deploying the medium/low voltage power supply system, fire alarm - automatic fire suppression system and safe ventilation, ensuring the progress of line testing and standard acceptance and handover.

Actual Images of the Project (8 photos)

Click on photo to enlarge
Overall perspective & construction site of Jinro Soju Wine Factory in Lien Ha Thai Industrial Park, Thai Binh
Overall perspective & construction site of Jinro Soju Wine Factory in Lien Ha Thai Industrial Park, Thai Binh
Panoramic view of the construction site of the HiteJinro Korea factory complex from above
Panoramic view of the construction site of the HiteJinro Korea factory complex from above
Construction of main factory structure and outdoor technical infrastructure
Construction of main factory structure and outdoor technical infrastructure
APECCons team of engineers supervises the construction of the mechanical, electrical and underground grounding systems at the construction site
APECCons team of engineers supervises the construction of the mechanical, electrical and underground grounding systems at the construction site
Checking the installation of underground cable pipes and technical manholes at the Thai Binh project
Checking the installation of underground cable pipes and technical manholes at the Thai Binh project
Gathering Knauf fireproofing materials and constructing mechanical and electrical systems - fire protection in the factory
Gathering Knauf fireproofing materials and constructing mechanical and electrical systems - fire protection in the factory
APECCons workers process and install EI standard fireproof duct systems
APECCons workers process and install EI standard fireproof duct systems
Construction and installation of water supply and drainage pipe systems and underground mechanical and electrical systems on concrete floors
Construction and installation of water supply and drainage pipe systems and underground mechanical and electrical systems on concrete floors