Tax ID: 0106577573

Consulting, Design, Approval & Construction of Fire Protection Systems

Comprehensive solutions from Design Consulting, Fire Protection Approval, New Installation Construction or Renovation and Upgrade of Addressable Fire Alarm System, Automatic Fire Sprinkler, Drencher Fire Prevention Membrane, FM-200/Novec/Nito Gas Fire Fighting, Incident Smoke Extraction and Fire Protection Acceptance.

Consulting, Design, Approval & Construction of Fire Protection Systems
Hệ tiêu chuẩn & Quy chuẩn kỹ thuật áp dụng: QCVN 06:2022/BXD (Revised 1:2023), TCVN 3890:2023, TCVN 7336:2021, TCVN 5738:2021, NFPA

Phạm Vi Hạng Mục Triển Khai Chính

  • ✓ Consulting on technical solutions, preparing design documents and implementing fire protection approval procedures according to the latest standards
  • ✓ Addressable automatic fire alarm system (Addressable Fire Alarm), beam smoke detector (Beam Detector), Vesda early fire alarm
  • ✓ Automatic fire sprinkler system, Drencher fire water wall system and fire hydrant on wall/outside house
  • ✓ Standard fire pump station (Main electric pump, Diesel backup pump, Jockey pressure compensation pump)
  • ✓ Clean air fire suppression system (FM-200, Novec 1230, IG-100/Nito) and Foam foam fire suppression system for chemical warehouses
  • ✓ Corridor smoke exhaust system, factory smoke exhaust system, emergency stairwell pressurization and fire protection renovation and acceptance for the factory in operation

Fire prevention and fighting is a legal and safety prerequisite for any industrial factory or commercial building to be allowed to operate. APECCons Proud to be one of the contractors with the strongest real combat capabilities in the country Large-scale new construction (over 100,000 m²) confused renovate, upgrade and accept fire protection for currently operating FDI factories (such as Lens Vietnam, Jinro Soju, Fantasy Tech, Power Logics Vina, UTI Vina, ETS Vina...).

APECCons' Distinctive Strengths in the Field of Fire Protection

  • Firmly grasp current fire prevention legal standards: Our team of design experts has a deep understanding of QCVN 06:2022/BXD (Revised 1:2023), TCVN 3890:2023, TCVN 7336:2021 and NFPA standards, helping to optimize design options right from the beginning, avoiding incurring modification costs.
  • Experience in renovating fire protection in manufacturing factories: Organize construction on a rolling basis, with absolute safety cover, without disrupting the Investor's delivery plan.
  • Complete companionship until the Fire Prevention and Control Acceptance Document is issued: Inter-check the entire system, measure water pressure parameters, exhaust air flow and complete all legal documents for acceptance.

Actual Images of Industrial Fire Protection System Construction

Construction of elevated fire protection pipes
Install automatic fire sprinkler pipe network using scissor lift
Fire pump room
Install standard fire pump assembly and control valve at FDI factory
Addressable automatic fire alarm cabinet
Connecting and interlocking the addressable automatic fire alarm center cabinet
📖 3D Competency Profile 085.432.1818 Request a Quote